DE eng

Search in the Catalogues and Directories

Hits 1 – 6 of 6

1
The influence of mounted assembly process on the stress-strain state of the lattice dome frame
In: Structural Mechanics of Engineering Constructions and Buildings, Vol 17, Iss 5, Pp 443-454 (2021) (2021)
BASE
Show details
2
Influence of the height of the ribbed-ring dome on the stress state of its frame during the overhang mounting process
In: Structural Mechanics of Engineering Constructions and Buildings, Vol 16, Iss 6, Pp 452-464 (2020) (2020)
BASE
Show details
3
Stress state of metal dome meridional ribs at different stages of overhang erection process
In: Structural Mechanics of Engineering Constructions and Buildings, Vol 16, Iss 2, Pp 111-121 (2020) (2020)
Abstract: Research aim. The aim of the present research was an analysis of a metal ribbed ring-shaped dome metallic ribs stress state at different stages of a skeleton overhang erection process. The considered dome is hemispherical and is assembled bottom-up of individual elements. Due to a varying slope of meridional ribs elements at different relative elevations their stress state changes during mounting. The effect of the overhang erection process onto the stress state of the metal dome meridional ribs has been investigated. The relationship between the stress state of a meridional rib and mounting of each next dome skeleton tier has been established. Methods. A mathematical model of the metal ribbed ring-shaped dome assembled of steel H-shaped elements with rigid connections has been developed. Several extra models corresponding to different skeleton erection stages have been also generated to determine stresses in the meridional ribs at these stages. Response of each dome mathematical model under dead-weight load has been simulated. The obtained values of stresses in the meridional ribs within different models have been compared with corresponding design stresses values. Results. The dependence of the metal dome meridional rib stress state onto the stages of overhang erection process has been plotted. A degree of utilization of ribs steel strength at different erection stages has been represented by diagrams. An estimation of the dome skeleton stress state during overhang erection has been given. Imminence of assembly stresses during overhang erection and their influence onto dome structural reliability has been pointed out.
Keyword: Architectural engineering. Structural engineering of buildings; mathematical model; metal skeleton; overhang erection; ribbed ring-shaped dome; stress state; stresses in ribs; TH845-895
URL: https://doi.org/10.22363/1815-5235-2020-16-2-111-121
https://doaj.org/article/df5c5b4802b64afcbce2b786c974824a
BASE
Hide details
4
Changes in the stressed state of the framework of the metal ribbed-ring dome during the assembly process
In: Structural Mechanics of Engineering Constructions and Buildings, Vol 15, Iss 4, Pp 278-290 (2019) (2019)
BASE
Show details
5
Behavior of the frames of large-span metal domes in the process of their installation
In: Structural Mechanics of Engineering Constructions and Buildings, Vol 14, Iss 6, Pp 481-494 (2018) (2018)
BASE
Show details
6
LARGE-SPAN METAL DOME ROOFS AND THEIR CONSTRUCTION
In: Structural Mechanics of Engineering Constructions and Buildings, Vol 14, Iss 1, Pp 4-16 (2018) (2018)
BASE
Show details

Catalogues
0
0
0
0
0
0
0
Bibliographies
0
0
0
0
0
0
0
0
0
Linked Open Data catalogues
0
Online resources
0
0
0
0
Open access documents
6
0
0
0
0
© 2013 - 2024 Lin|gu|is|tik | Imprint | Privacy Policy | Datenschutzeinstellungen ändern