1 |
Enriching Artificial Intelligence Explanations with Knowledge Fragments
|
|
|
|
In: Future Internet; Volume 14; Issue 5; Pages: 134 (2022)
|
|
BASE
|
|
Show details
|
|
2 |
i-Dataquest: A heterogeneous information retrieval tool using data graph for the manufacturing industry
|
|
|
|
In: ISSN: 0166-3615 ; Computers in Industry ; https://hal.archives-ouvertes.fr/hal-03330584 ; Computers in Industry, Elsevier, 2021, 132, pp.103527. ⟨10.1016/j.compind.2021.103527⟩ (2021)
|
|
BASE
|
|
Show details
|
|
3 |
Micro-work, artificial intelligence and the automotive industry
|
|
|
|
In: ISSN: 0391-2078 ; EISSN: 1972-4977 ; Journal of Industrial and Business Economics = Economia e politica industriale ; https://hal.archives-ouvertes.fr/hal-02148979 ; Journal of Industrial and Business Economics = Economia e politica industriale, Springer, 2019, pp.1-13. ⟨10.1007/s40812-019-00121-1⟩ ; https://link.springer.com/article/10.1007/s40812-019-00121-1 (2019)
|
|
BASE
|
|
Show details
|
|
4 |
The Emergence and Rise of Industry 4.0 Viewed through the Lens of Management Fashion Theory
|
|
|
|
In: Administrative Sciences ; Volume 9 ; Issue 3 (2019)
|
|
BASE
|
|
Show details
|
|
5 |
The emergence and rise of industry 4.0 viewed through the lens of management fashion theory
|
|
|
|
BASE
|
|
Show details
|
|
6 |
Multi-Stage Multi-Period Production Planning In Wire And Cable Industry ...
|
|
|
|
BASE
|
|
Show details
|
|
7 |
Multi-Stage Multi-Period Production Planning In Wire And Cable Industry ...
|
|
|
|
Abstract:
This paper presents a methodology for serial production planning problem in wire and cable manufacturing process that addresses the problem of input-output imbalance in different consecutive stations, hoping to minimize the halt of machines in each stage. To this end, a linear Goal Programming (GP) model is developed, in which four main categories of constraints as per the number of runs per machine, machines’ sequences, acceptable inventories of machines at the end of each period, and the necessity of fulfillment of the customers’ orders are considered. The model is formulated based upon on the real data obtained from IKO TAK Company, an important supplier of wire and cable for oil and gas and automotive industries in Iran. By solving the model in GAMS software the optimal number of runs, end-of-period inventories, and the possible minimum idle time for each machine are calculated. The application of the numerical results in the target company has shown the efficiency of the proposed model and the solution ... : {"references": ["Tehran Bourse News Agency, http://www.boursenews.ir/fa/news/156728/investigating wire and cable industry in the world and Iran, -20 April 2018.", "E. Mehdizadeha, S.T. Akhavan Niaki, M. Hemati, \"A bi-objective aggregate production planning problem with learning effect and machine deterioration: Modeling and solution\", Computers and Operations Research, vol. 91, pp. 21\u201336, 2018.", "M. Gupta, B. K. Mohanty, \"Multi-stage multi-objective production planning using linguistic and numeric data-a fuzzy integer programming model\", Computers & Industrial Engineering, vol. 87, pp. 454\u2013464, 2015.", "S. Beraa, I. Mukherjee, \"A multistage and multiple response optimization approach for serial manufacturing system\", European Journal of Operational Research, vol. 248, pp. 44\u2013452, 2016.", "S. Lu, H. Su, Y. Wang, L. Xie, Q. Zhang, Multi-product Multi-stage Production Planning with Lead Time on a Rolling Horizon Basis, IFAC-PapersOnLine. Vol. 48, pp. 1162\u20131167, 2015.", "S. ...
|
|
Keyword:
goal programming approach.; production planning; Serial manufacturing process; wire and cable industry
|
|
URL: https://dx.doi.org/10.5281/zenodo.1317438 https://zenodo.org/record/1317438
|
|
BASE
|
|
Hide details
|
|
9 |
SM01: Web Crawling with JLC parallel execution pattern - experiment reports ...
|
|
|
|
BASE
|
|
Show details
|
|
11 |
SM01: Web crawler benchmark QES15 and QES30 experiments results ...
|
|
|
|
BASE
|
|
Show details
|
|
12 |
SM01: Web Crawling with DLC parallel execution pattern - experiment reports ...
|
|
|
|
BASE
|
|
Show details
|
|
13 |
SM01: Linguistic Resources - the Semantic Lexicon of Serbian Sheet Metal Manufacturing Web ...
|
|
|
|
BASE
|
|
Show details
|
|
14 |
Green supply chain performance measurement using fuzzy-ANP based balanced scorecard: A collaborative decision-making approach
|
|
|
|
In: Bhattacharya, Arijit, Mohapatra, Priyabrata, Kumar, Vikas orcid:0000-0002-8062-7123 , Dey, Prasanta Kumar, Brady, Malcolm orcid:0000-0002-4276-3976 , Tiwari, Manoj Kumar and Nudurupati, Sai S. (2014) Green supply chain performance measurement using fuzzy-ANP based balanced scorecard: A collaborative decision-making approach. Production Planning & Control: The Management of Operations, 25 (8). pp. 698-714. ISSN 1366-5871 (2014)
|
|
BASE
|
|
Show details
|
|
15 |
In search of sustainable materials: negotiating materiality and morality in the UK materials industry
|
|
Wilkes, SE. - : UCL (University College London), 2014
|
|
In: Doctoral thesis, UCL (University College London). (2014)
|
|
BASE
|
|
Show details
|
|
16 |
Using the Feature Exchange Language in the Next Generation Controller
|
|
|
|
In: DTIC AND NTIS (1990)
|
|
BASE
|
|
Show details
|
|
|
|