DE eng

Search in the Catalogues and Directories

Hits 1 – 2 of 2

1
Multi-Stage Multi-Period Production Planning In Wire And Cable Industry ...
BASE
Show details
2
Multi-Stage Multi-Period Production Planning In Wire And Cable Industry ...
Abstract: This paper presents a methodology for serial production planning problem in wire and cable manufacturing process that addresses the problem of input-output imbalance in different consecutive stations, hoping to minimize the halt of machines in each stage. To this end, a linear Goal Programming (GP) model is developed, in which four main categories of constraints as per the number of runs per machine, machines’ sequences, acceptable inventories of machines at the end of each period, and the necessity of fulfillment of the customers’ orders are considered. The model is formulated based upon on the real data obtained from IKO TAK Company, an important supplier of wire and cable for oil and gas and automotive industries in Iran. By solving the model in GAMS software the optimal number of runs, end-of-period inventories, and the possible minimum idle time for each machine are calculated. The application of the numerical results in the target company has shown the efficiency of the proposed model and the solution ... : {"references": ["Tehran Bourse News Agency, http://www.boursenews.ir/fa/news/156728/investigating wire and cable industry in the world and Iran, -20 April 2018.", "E. Mehdizadeha, S.T. Akhavan Niaki, M. Hemati, \"A bi-objective aggregate production planning problem with learning effect and machine deterioration: Modeling and solution\", Computers and Operations Research, vol. 91, pp. 21\u201336, 2018.", "M. Gupta, B. K. Mohanty, \"Multi-stage multi-objective production planning using linguistic and numeric data-a fuzzy integer programming model\", Computers & Industrial Engineering, vol. 87, pp. 454\u2013464, 2015.", "S. Beraa, I. Mukherjee, \"A multistage and multiple response optimization approach for serial manufacturing system\", European Journal of Operational Research, vol. 248, pp. 44\u2013452, 2016.", "S. Lu, H. Su, Y. Wang, L. Xie, Q. Zhang, Multi-product Multi-stage Production Planning with Lead Time on a Rolling Horizon Basis, IFAC-PapersOnLine. Vol. 48, pp. 1162\u20131167, 2015.", "S. ...
Keyword: goal programming approach.; production planning; Serial manufacturing process; wire and cable industry
URL: https://dx.doi.org/10.5281/zenodo.1317438
https://zenodo.org/record/1317438
BASE
Hide details

Catalogues
0
0
0
0
0
0
0
Bibliographies
0
0
0
0
0
0
0
0
0
Linked Open Data catalogues
0
Online resources
0
0
0
0
Open access documents
2
0
0
0
0
© 2013 - 2024 Lin|gu|is|tik | Imprint | Privacy Policy | Datenschutzeinstellungen ändern