1 |
The influence of mounted assembly process on the stress-strain state of the lattice dome frame
|
|
|
|
In: Structural Mechanics of Engineering Constructions and Buildings, Vol 17, Iss 5, Pp 443-454 (2021) (2021)
|
|
BASE
|
|
Show details
|
|
2 |
Influence of the height of the ribbed-ring dome on the stress state of its frame during the overhang mounting process
|
|
|
|
In: Structural Mechanics of Engineering Constructions and Buildings, Vol 16, Iss 6, Pp 452-464 (2020) (2020)
|
|
BASE
|
|
Show details
|
|
3 |
Stress state of metal dome meridional ribs at different stages of overhang erection process
|
|
|
|
In: Structural Mechanics of Engineering Constructions and Buildings, Vol 16, Iss 2, Pp 111-121 (2020) (2020)
|
|
BASE
|
|
Show details
|
|
4 |
Changes in the stressed state of the framework of the metal ribbed-ring dome during the assembly process
|
|
|
|
In: Structural Mechanics of Engineering Constructions and Buildings, Vol 15, Iss 4, Pp 278-290 (2019) (2019)
|
|
BASE
|
|
Show details
|
|
5 |
Behavior of the frames of large-span metal domes in the process of their installation
|
|
|
|
In: Structural Mechanics of Engineering Constructions and Buildings, Vol 14, Iss 6, Pp 481-494 (2018) (2018)
|
|
BASE
|
|
Show details
|
|
6 |
LARGE-SPAN METAL DOME ROOFS AND THEIR CONSTRUCTION
|
|
|
|
In: Structural Mechanics of Engineering Constructions and Buildings, Vol 14, Iss 1, Pp 4-16 (2018) (2018)
|
|
BASE
|
|
Show details
|
|
|
|